Title:
Concreting Methods at the Chute a Caron Dam
Author(s):
I.E Burks
Publication:
Journal Proceedings
Volume:
26
Issue:
Appears on pages(s):
315-358
Keywords:
none
DOI:
10.14359/8157
Date:
2/1/1930
Abstract:
This paper tells of prospecting for materials at 30 deg below under 4 ft of snow - how those materials were sampled, chosen, transported, heated, proportioned; how concrete was mixed, conveyed, deposited, protected. Describes the use of a large aggregate with a big gap in sizes - to prevent raveling in stock-piles and bins, harshness and segregation after mixing and placing of a stiff mix with vibrators. Other construction operations are described.