Title:
Peace Bridge Rehabilitation
Author(s):
Lou Kuhlmann
Publication:
Concrete International
Volume:
11
Issue:
11
Appears on pages(s):
30-32
Keywords:
bridge decks; bridges (structures); concretes; latex; renovating; resurfacing; styrene butadiene resins; Construction
DOI:
Date:
11/1/1989
Abstract:
International Peace Bridge is undergoing rehabilitation and deck resurfacing using concrete modified with styrene-butadiene latex. The latex modified concrete (LMC) is buggied from a dedicated mobile mixer site near the bridge entrance to placement sites on the deck. Based on the success of its first phase, one year is being pared from the original 3-year project.