In todayโs market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have itโฆthey are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete.
Staff Directory
ACI World Headquarters 38800 Country Club Dr. Farmington Hills, MI 48331-3439 USA Phone: 1.248.848.3800 Fax: 1.248.848.3701
ACI Middle East Regional Office Second Floor, Office #207 The Offices 2 Building, One Central Dubai World Trade Center Complex Dubai, UAE Phone: +971.4.516.3208 & 3209
ACI Resource Center Southern California Midwest Mid Atlantic
Feedback via Email Phone: 1.248.848.3800
ACI Global Home Middle East Region Portal Western Europe Region Portal
Home > Tools > Frequently Asked Questions
Q. How should samples of freshly mixed concrete be taken in the field to provide information on concrete in the structure? A. Samples should be taken as close to the point of placement as possible. Many times they are obtained at the point of discharge of the concrete from the mixer. Other points of sampling may be specified, such as the discharge of a concrete pump. Samples should be taken from several points in a batch in sufficient quantity so that, when mixed together, an excess of material will be available for the required number of specimens. The test sample should be protected carefully from loss of moisture and should be remixed and handled to the minimum degree necessary. Improper sampling leads to misinformation on the properties of concrete (ASTM C172). References: SP-1(02); ASTM C172 Topics in Concrete: Concrete Fundamentals; Testing of Concrete
Q. How should samples of freshly mixed concrete be taken in the field to provide information on concrete in the structure?
A. Samples should be taken as close to the point of placement as possible. Many times they are obtained at the point of discharge of the concrete from the mixer. Other points of sampling may be specified, such as the discharge of a concrete pump. Samples should be taken from several points in a batch in sufficient quantity so that, when mixed together, an excess of material will be available for the required number of specimens. The test sample should be protected carefully from loss of moisture and should be remixed and handled to the minimum degree necessary. Improper sampling leads to misinformation on the properties of concrete (ASTM C172).
References: SP-1(02); ASTM C172
Topics in Concrete: Concrete Fundamentals; Testing of Concrete
Search other resources on the ACI website for answers to technical questions