ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

International Concrete Abstracts Portal

  


Title: Ting Kau bridge. Design and construction

Author(s): Ayala Luna, J.; Andrés Gil, J.

Publication: ACHE

Volume: 48

Issue: 203

Appears on pages(s): 109 - 121

Keywords:

DOI:

Date: 1/1/1997

Abstract:
The Ting Kau bridge has been designed as a composite deck cable stayed bridge 1177 m. lenght with 1695 m. total length of prestressed concrete box girder approaches. The cable stayed bridge has three single pillons with spans of 127 + 448 + 475 + 127 m. The width allows three lanes in each direction and jointing ramps. The approach structures, cantilever construction mainly, have variable spans, with 115 m. maximum lentgh. The article includes a justification of the selected structural solution, as well as a description of the main characteristics of the Project, design criteria, construction methods and singularities, giving cuantities and production rates. Wind tunnel tests carried out to study the aerodinamic behaviour of the cable stayed bridge are also detailed.


ACI International Partner, ACHE Spain, International Partner Access

View Resource »