Estimating Maximum Temperature Difference in Mass Concrete

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: Estimating Maximum Temperature Difference in Mass Concrete

Author(s): Ronald Kozikowski and Bruce Suprenant

Publication: Symposium Paper

Volume: 325

Issue:

Appears on pages(s): 5.1-5.14

Keywords:

DOI: 10.14359/51710946

Date: 7/25/2018

Abstract:
To minimize thermal cracking, specifications for mass concrete often state a maximum allowable temperature difference, ΔT, between the hottest interior location (usually the center) and surface of the mass concrete section in the days following placement. Section 8 of ACI 301-05, “Specifications for Structural Concrete,” did not set such a limit, but the recent revision, ACI 301-10, sets a default value of 35F for the difference (see box). The 35F difference is based on experience with unreinforced mass concrete dams where the consequences of cracking and subsequent water leakage were critical. For mass concrete in mat foundations, large piers, and thick walls, 35F may be unduly conservative.

Related References:

1. Gajda, John and VanGeem, Martha, “Controlling Temperatures in Mass Concrete”, Concrete International, January 2002, pages 59-62.

2. Whittier, Steve, Olyniec, Jim and McGlohn, Robert, “Minimizing Temperature Differentials in Mass Concrete”, Concrete International, December 2004, pages 42-45.

3. Suprenant, Bruce A. and Malisch, Ward R., “Contractors’ Guide to Mass Concrete”, Concrete International, January 2008, pages 37-40.

4. ACI 301-10, “Specifications for Structural Concrete”; American Concrete Institute.

5. ACI 207.2R-07 “Report on Thermal and Volume Change Effects on Cracking of Mass Concrete,” American Concrete Institute, Farmington Hills, MI, 2007, 32 pp.

6. Harrison, T.A., “Early-age thermal crack control in concrete”, Report 91, Construction Industry Research and Information Association (CIRIA), 1981.

7. Bamforth, P.B. and Price, W.F., “Concreting deep lifts and large volume pours”, Report 135, Construction Industry Research and Information Association(CIRIA), 1995.

8. Bamforth, P.B., “Early-age thermal crack control in concrete”, C660, Construction Industry Research and Information Association (CIRIA), 2007.

9. Bamforth, P.B., “Mass Concrete”, Concrete Society Digest No. 2, The Concrete Society, 1984, 8 pages.

10. CRD-C 71, "Standard Test Method for Ultimate Strain Capacity of Concrete.” U.S. Army Corps of Engineers, Waterways Experiment Station, Vickburg, MS, 1980, 3 pp.

11. Houghton, D.L., “Determining tensile strain capacity in mass concrete”, Journal of the American Concrete Institute, December 1976, pages 691-700.

12. Florida DOT

13. Delaware DOT

14. Colorado DOT

15. Virginia DOT

16. ACI 209R-92, “Prediction of Creep, Shrinkage, and Temperature Effects in Concrete Structures,” American Concrete Institute, 1992, 47 pp.

17. ACI 318-08, “Building Code Requirements for Structural Concrete,” American Concrete Institute, 2008, p. 135.

18. ASTM C 171-07, “Standard Specification for Sheet Materials for Curing Concrete,” ASTM International, West Conshocken, PA, 2007, 2 pp.