Evaluation of Different Techniques for Repair of Shear-span Corroded RC Beams

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: Evaluation of Different Techniques for Repair of Shear-span Corroded RC Beams

Author(s): Hesham Elhuni and Khaled A. Soudki

Publication: Symposium Paper

Volume: 322

Issue:

Appears on pages(s): 6.1-6.20

Keywords: Fiber reinforced cement based matrix; Shear-span corrosion; Bond failure; Patch repair; End slip

DOI: 10.14359/51706957

Date: 6/18/2018

Abstract:
This paper examined the effects of corrosion of the longitudinal reinforcement in the shear span on the structural behavior of RC beams and the effectiveness of three rehabilitation schemes. The experimental program consisted of testing fifteen medium-scale reinforced concrete beams, 150 mm(6 in) wide x 350 mm(14 in) deep x 2400 mm(95 in) long, under static load (displacement-control configuration). The test variables included: span to depth ratio (a/d=2.4 and 3.4), anchorage end condition (anchored and unanchored), the degree of corrosion (2.5%, 5%, 7.5%, 15% mass loss), and repair schemes (patch repair, U wrap with Glass fiber reinforced cement-based composite, U wrap with Carbon fiber reinforced cement-based composite). Following corrosion and repair, all specimens were loaded statically to failure. Test results showed no major effect of shear-span corrosion on the flexural behavior for the beams with end anchorage whereas a noticeable effect on the flexural behavior was observed for beams with no end anchorage. The corrosion degree and the shear span to depth ratio affected the mode of failure for the specimens with no end anchorages. The type of repair significantly affected the overall behavior of the repaired-corroded specimens.

Related References:

ACI Committee 546, "Concrete repair guide (ACI 546R-96)," American Concrete Institute, Farmington Hills, Mich., 1996, 41pp.

ASTM. Standard practice for preparing, cleaning, and evaluating corrosion test specimens. G1-90, West Conshohocken, PA, 2002.

Badawi, M., & Soudki, K. 2010. CFRP repair of RC beams with shear-span and full-span corrosions. Journal of Composites for Construction, 14: 323-335.

Fib, 2000, Bond of Reinforcement in Concrete, State-of-the-art Report, Bulletin 10, fib-International Federation for Structural Concrete, Lausanne.

Masoud, S., & Soudki, K.A. 2000. Serviceability of corroded carbon fibre reinforced polymer strengthened reinforced concrete beams. Proceedings of 3rd Structural Speciality Conference of the Canadian Society for Civil Engineering, 507-514. London.

Nossoni, G., & Harichandran, R. S. 2010. Improved repair of concrete structures using polymer concrete patch and frp overlay. Journal of Materials in Civil Engineering, 22: 314-322.

Soudki, K., El-Salakawy, E., & Craig, B. 2007. Behavior of CFRP strengthened reinforced concrete beams in corrosive environment. Journal of Composites for Construction, 11: 291-298.

Soudki, K. A., & Sherwood, T. G. 2000. Behaviour of reinforced concrete beams strengthened with carbon fibre reinforced polymer laminates subjected to corrosion damage. Canadian Journal of Civil Engineering, 27: 1005-1010.

Sahamitmongkol, R., Suwathanangkul, S., Phoothong, P., and Kato, Y., 2008, Flexural behavior of corroded RC members with patch repair-experimental & simulation. Journal of Advanced Concrete Technology, 6: 317-336.

Wang, X., & Liu, X., 2010. Simplified methodology for the evaluation of the residual strength of corroded reinforced concrete beams. Journal of Performance of Constructed Facilities, 24: 108-119.

Wang, X., Gao, X., Li, B., & Deng, B. 2011. Effect of bond and corrosion within partial length on shear behaviour and load capacity of RC beam. Construction and Building Materials, 25: 1812-1823.