ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

International Concrete Abstracts Portal

  


Title: Effect of Piezoelectric Ring Sensor Size on Early-Age Property Monitoring of Self-Consolidating Concrete

Author(s): Siwar Naji, Kamal H. Khayat, and Mourad Karray

Publication: Materials Journal

Volume: 115

Issue: 6

Appears on pages(s): 813-824

Keywords: nondestructive testing; P-RAT; self-consolidating concrete; setting time; shear wave velocity

DOI: 10.14359/51706939

Date: 11/1/2018

Abstract:
The objective of this paper is to investigate the effect of the sensor size used in the piezoelectric ring actuator technique (P-RAT) on the accuracy of shear wave (S-wave) measurements that can be used to determine setting characteristics of concrete. Three different P-RAT sensor dimensions operating at different central frequencies of 25, 28, and 45 kHz (big, medium, and small P-RAT, respectively) were investigated. In total, 14 self-consolidating concrete (SCC) mixtures were proportioned with slump-flow values of 600 to 780 mm (23.6 to 30.7 in.). A conventional concrete was also prepared with 220 mm (8.7 in.) slump. The quality of the transmitted signal was found to be higher when using the big P-RAT sensor where less scattering and less energy loss were obtained. This can make it easier to determine the S-wave arrival time, which is needed to calculate the S-wave velocity for concrete with relatively high precision. The setting time of concrete based on the criteria of the S-wave velocity (Vs) derivative is shown to correspond well to values evaluated using the standard penetration resistance test tested on mortar sieved from concrete. The results showed that the big P-RAT sensor is suitable to determine the setting time of concrete by means of the derivative S-wave velocity (in time domain). However, the average setting time of mortar sieved from concrete determined from the standard penetration resistance occurred approximately 60 minutes later compared to the setting time of concrete obtained with the P-RAT approach. This shift can be due to the presence of coarse aggregate that can affect Vs.