Title:
Working 9 to 5?
Author(s):
Awad S. Hanna and Michael Maples
Publication:
Concrete International
Volume:
19
Issue:
12
Appears on pages(s):
61
Keywords:
construction; manpower; overtime; second shift;
DOI:
Date:
12/1/1997
Abstract:
In this, the third and last article in a series dealing with compressed or accelerated construction schedules, an experienced contractor gives tips/guidelines for the addition of a second shift.