International Concrete Abstracts Portal

  


Title: Rehabilitation Of Clear Water Reservior

Author(s): Ram Kumar, P. C. Sharma, A. K. Pandey, D. N. Trikha

Publication: Concrete International

Volume: 18

Issue: 6

Appears on pages(s): 49-53

Keywords:

DOI:

Date: 6/1/1996

Abstract:
In 1982, the 10 million liter (2.6 million gallon) capacity semi-underground reinforced concrete Clear Water Reservoir (CWR) was constructed and commissioned in a major city in northern India. Six months later, cracks had developed near the corners of the structure, resulting in water leakage. Ultimately, the cracking became so severe that it became virtually impossible for the reservoir to retain water.




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer