Title: Chaffey Dam Morning Glory Spillway

Author(s): Marianne Reich

Publication: Concrete International

Volume: 2

Issue: 12

Appears on pages(s): 23-26

Keywords: concrete construction; dams; formwork. (construction); spillways; structural design.

DOI:

Date: 12/1/1980

Abstract:
The unusual shape of the Chaffey Dam spillway is both innovative and functional. The 47 (154 ft) high structure was constructed in three different stages and required more than 32,700 m (107,283 ft) of concrete. The biggest challenge to the contractor was the formwork design and implementation. [Author]




  