Title: Precast Elements, Fast-Track Construction Create an Operating Plant in 6 1/2 Months

Author(s): ACI

Publication: Concrete International

Volume: 1

Issue: 4

Appears on pages(s): 34-38

Keywords: beams (supports); columns (supports); concrete construction; concrete panels; framing systems; mixing plants; precast concrete; prestressed concrete; shear walls.

DOI:

Date: 4/1/1979

Abstract:
The temperature hovered below zero F and the earth was frozen solid up to 9 ft deep. Yet, a ready-mixed concrete plant in Anchorage, Alaska, was built and in operation in only 6 1/2 months. Precast concrete was selected as the building material because of the frigid weather and accelerated construction schedule.




  