Title: Design and Construction of the I-15/US 95 Interchange, Stage 2

Author(s): Fred Y. Feng and Juan A. Murillo

Publication: Concrete International

Volume: 22

Issue: 6

Appears on pages(s): 19-25

Keywords: bridge construction; bridge pier; precast segmental construction; precast concrete; prestressed concrete

DOI:

Date: 6/1/2000

Abstract:
The reconstruction of the I-15/U.S. 95 core interchange in Las Vegas is the first major project in the western U.S. to use a precast concrete segmental span-by-span construction design as the predominant structure type. The design was developed using four to five span continuous frame structures with each span length around 40 m (130 ft). Due to the aggressive construction schedule, the four balanced cantilever spans use alternative erection method using two cranes from ground level




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer