Title:
Improving Early Strength of Low Clinker Cements and Concretes
Author(s):
Bejjarapu
Publication:
Web Session
Volume:
ws_F24_Bejjarapu.pdf
Issue:
Appears on pages(s):
Keywords:
DOI:
Date:
11/3/2024
Abstract:
Lowering the clinker content of cement and concrete is critical to lowing their carbon footprint. The main technical limitation is the early strength at 1 or 2 days needed to keep existing construction schedules. In this presentation we will look at strategies to improve early strength development, including optimised grinding and particle packing, seeding and accelerators.