Concrete Q&A: Designing Shoring/Reshoring Schedules for a Fast-Track Project

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: Concrete Q&A: Designing Shoring/Reshoring Schedules for a Fast-Track Project

Author(s): Pericles C. Stivaros

Publication: Concrete International

Volume: 45

Issue: 6

Appears on pages(s): 79-80

Keywords: slab, load, strength, form

DOI: 10.14359/51738860

Date: 6/1/2023

Abstract:
We are in the process of designing shoring and reshoring schedules for the construction of a high-rise flat-plate type reinforced concrete building on a tight schedule. Does ACI have guidelines and/or recommendations for construction procedures that can help us meet the fast-track project requirements?

Related References:

1. ACI Committee 347, “Guide to Shoring/Reshoring of Concrete Multistory Buildings (ACI 347.2R-17),” American Concrete Institute, Farmington Hills, MI, 2017, 22 pp.

2. ACI Committee 318, “ACI CODE-318-19(22): Building Code Requirements for Structural Concrete and Commentary (Reapproved 2022),” American Concrete Institute, Farmington Hills, MI, 2019, 624 pp.

3. Scanlon, A., and Suprenant, B.A., “Estimating Two-Way Slab Deflections,” Concrete International, V. 33, No. 7, July 2011, pp. 29-34.

4. ACI Committee 347, “Guide to Formwork for Concrete (ACI 347R-14) (Reapproved 2021),” American Concrete Institute, Farmington Hills, MI, 2014, 36 pp.

5. Johnston, D.W., “Formwork for Concrete,” SP-4(14), eighth edition, American Concrete Institute, Farmington Hills, MI, 2014, 512 pp.




  

Edit Module Settings to define Page Content Reviewer