Concrete Q&A: Cover Requirements for Pipes and Ducts in Concrete and Cement Requirements for Exposure Class S2

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: Concrete Q&A: Cover Requirements for Pipes and Ducts in Concrete and Cement Requirements for Exposure Class S2

Author(s):

Publication: Concrete International

Volume: 42

Issue: 9

Appears on pages(s): 68

Keywords:

DOI: 10.14359/51728157

Date: 9/1/2020

Abstract:

Q: Our company was recently awarded the contract to build a post-tensioned parking structure. The construction documents include a typical detail showing that reinforcing bars are to be no closer than 1 in. from embedded pipes, ducts, or sleeves. This requirement creates a constructability challenge. Is it based on technical publications published by ACI? The specified maximum aggregate size is 3/8 in. Q: According to Table 19.3.2.1 in ACI 318-19,1 a Type V cement is required for Exposure Class S2, while footnote [6] allows the use of a Type I or Type III cement with C3A content of less than 5%. How about a Type II cement if it has a C3A content of less than 5%?

Related References:

1. ACI Committee 318, “Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19),” American Concrete Institute, Farmington Hills, MI, 2019, 623 pp.

2. ACI Committee 318, “Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19),” American Concrete Institute, Farmington Hills, MI, 2019, 623 pp.




  

Edit Module Settings to define Page Content Reviewer