CONDITION ASSESSMENT OF PRESTRESSED CONCRETE BEAMS USING CYCLIC AND MONOTONIC LOAD TESTS

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: CONDITION ASSESSMENT OF PRESTRESSED CONCRETE BEAMS USING CYCLIC AND MONOTONIC LOAD TESTS

Author(s): Mohamed K. ElBatanouny, Antonio Nanni, Paul H. Ziehl, and Fabio Matta

Publication: Structural Journal

Volume: 112

Issue: 1

Appears on pages(s): 81-90

Keywords: corrosion; cyclic load test (CLT); monotonic (24-hour) load test; prestressed concrete (PC).

DOI: 10.14359/51687181

Date: 1/1/2015

Abstract:
Eight prestressed T-shaped beams were tested using the cyclic load test (CLT) method as proposed by ACI 437-12 followed by the ACI 318-11 monotonic (24-hour) load test method. The objective of the study is to assess the ability of these methods to evaluate damage in prestressed concrete (PC) beams. The test matrix included both pristine beams (subjected to no prior loading) as well as beams that were cracked and artificially predamaged using accelerated corrosion techniques, impressed current, and wet/dry cycles, prior to load testing. Deflections, crack widths, and slipping of the prestressing strands were recorded during the load tests. The load at which the monotonic test was conducted was chosen to be greater than the service load of Class U PC members, which does not allow cracking. This ensured that at the time of the monotonic load test the specimens were significantly damaged. However, the acceptance criteria associated with this test methodology were still met. Only one index in the CLT acceptance criteria (deviation from linearity) identified the condition of the specimens. The deviation from linearity index is found to correlate to the opening and widening of cracks.

Related References:

1. American Society of Civil Engineers (ASCE), “Report Card for America’s Infrastructure,” Reston, VA, 2009.

2. ElBatanouny, M.; Mangual, J.; Barrios, F.; Ziehl, P.; and Matta, F., “Acoustic Emission and Cyclic Load Test Criteria Development for Prestressed Girders,” Structural Faults and Repair 2012, Edinburgh, Scotland, UK, 2012, 9 pp.

3. Ziehl, P. H.; Galati, N.; Nanni, A.; and Tumialan, J. G., “In Situ Evaluation of Two Concrete Slab Systems. II: Evaluation Criteria and Outcomes,” Journal of Performance of Constructed Facilities, ASCE, V. 22, No. 4, 2008, pp.  217-227. doi: 10.1061/(ASCE)0887-3828(2008)22:4(217)

4. Galati, N.; Nanni, A.; Tumialan, J. G.; and Ziehl, P. H., “In Situ Evaluation of Two Concrete Slab Systems. Part I: Load Deformation and Loading Procedure,” Journal of Performance of Constructed Facilities, ASCE, V. 22, No. 4, 2008, pp. 207-216. doi: 10.1061/(ASCE)0887-3828(2008)22:4(207)

5. ACI Committee 318, “Building Code Requirements for Structural Concrete (ACI 318-11) and Commentary,” American Concrete Institute, Farmington Hills, MI, 2011, 503 pp.

6. ACI Committee 437, “Test Load Magnitude, Protocol, and Acceptance Criteria (ACI 437.1R-07),” American Concrete Institute, Farmington Hills, MI, 2007, 38 pp.

7. ACI Committee 437, “Code Requirements For Load Testing of Existing Concrete Structures (ACI 437-12),” American Concrete Institute, Farmington Hills, MI, 2012, 25 pp.

8. Galati, N.; Casadei, P.; Lopez, A.; and Nanni, A., “Load Test Evaluation of Augspurger Ramp Parking Garage in Buffalo, N.Y.,” RB2C Report, University of Missouri-Rolla, Rolla, MO, 2004.

9. Casadei, P., and Parretti, R., “Nanni, A.; and Heinze, T., “In-Situ Load Testing of Parking Garage RC Slabs: Comparison Between 24-h and Cyclic Load Testing,” Practice Periodical on Structural Design and Construction, ASCE, V. 10, No. 1, 2005, pp. 40-48. doi: 10.1061/(ASCE)1084-0680(2005)10:1(40)

10. Gold, W. J., and Nanni, A., “In-Situ Load Testing to Evaluate New Repair Techniques,” Proceedings, NIST Workshop on Standards Development for the Use of Fiber Reinforced Polymers for the Rehabilitation of Concrete and Masonry Structures, National Institute of Standards and Technology, Gaithersburg, MD, 1998, pp. 102-112.

11. Nanni, A., and Gold, W., “Evaluating CFRP Strengthening Systems In-situ,” Concrete Repair Bulletin, V. 11, No. 1, Jan.-Feb. 1998, pp. 12-14.

12. Nanni, A., and Gold, W. J., “Strength Assessment of External FRP Reinforcement,” Concrete International, V. 20, No. 6, June 1998, pp. 39-42.

13. Mettemeyer, M., and Nanni, A., “Guidelines for Rapid Load Testing of Concrete Structural Members,” Report No. 99-5, Center for Infrastructure Engineering Studies, University of Missouri-Rolla, Rolla, MO, 1999.

14. Auyeung, Y.; Balaguru, B.; and Chung, L., “Bond Behavior of Corroded Reinforcement Bars,” ACI Materials Journal, V. 97, No. 2, Mar.-Apr. 2000, pp. 214-220.

15. Mangat, P. S., and Molloy, B. T., “Prediction of Long Term Chloride Concentration in Concrete,” Materials and Structures, V. 27, No. 6, 1994, pp. 338-346. doi: 10.1007/BF02473426

16. ElBatanouny, M. K., “Implementation of Acoustic Emission as a Non-Destructive Evaluation Method for Concrete Structures,” PhD dissertation, Department of Civil and Environmental Engineering, University of South Carolina, Columbia, SC, 2012, 184 pp.

17. ElBatanouny, M. K.; Ziehl, P.; Larosche, A.; Mangual, J.; Matta, F.; and Nanni, A., “Acoustic Emission Monitoring for Assessment of Prestressed Concrete Beams,” Construction and Building Materials, V. 58, 2014, pp. 46-53. doi: 10.1016/j.conbuildmat.2014.01.100

18. Lovejoy, S., “Acoustic Emission Testing of Beams to Simulate SHM of Vintage Reinforced Concrete Deck Girder Highway Bridges,” Structural Health Monitoring, V. 7, No. 4, 2008, pp. 327-346. doi: 10.1177/1475921708090567


ALSO AVAILABLE IN:

Electronic Structural Journal



  

Edit Module Settings to define Page Content Reviewer