International Concrete Abstracts Portal

  


Title: Concrete Q & A: What’s the maximum allowable time between the two concrete placements at a construction joint in a reinforced concrete suspended slab?

Author(s):

Publication: Concrete International

Volume: 34

Issue: 9

Appears on pages(s): 76

Keywords:

DOI:

Date: 9/1/2012

Abstract:
What’s the maximum allowable time between the two concrete placements at a construction joint in a reinforced concrete suspended slab?




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer