International Concrete Abstracts Portal

  


Title: Concrete Q & A: Vapor Retarders and Depth of Cover

Author(s):

Publication: Concrete International

Volume: 26

Issue: 12

Appears on pages(s): 103-104

Keywords:

DOI:

Date: 12/1/2004

Abstract:
The design for a 4-in.-thick (100 mm) concrete slab-on-ground calls for No. 5 reinforcing bars on 18 in. (460 mm) centers, both ways. The slab will be placed directly on a 6-mil-thick (0.2 mm) polyethylene vapor retarder. I believe the vapor retarder will deteriorate within 10 years. Does this mean that the slab must be thicker, to allow for 3 in. (76 mm) of cover for reinforcement in concrete cast against and permanently exposed to earth, as required by Section 7.7.2 of ACI 318-02, “Building Code Requirements for Structural Concrete”?




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer