Title:
Joint Reconstruction on the Tappan Zee Bridge
Author(s):
R.C. Donnaruma
Publication:
Symposium Paper
Volume:
70
Issue:
Appears on pages(s):
1171-1180
Keywords:
bridge decks; bridges (structures); control joints; durability; field tests; joint sealers; joints (junctions); maintenance; performance; plastics, polymers and resins; repairs; resurfacing
DOI:
10.14359/17455
Date:
1/1/1981
Abstract:
The installation and performance of an elastomoeric concrete bridge joint hearder system is discussed as a prototype for application to specific short span joint reconstruction and performance requirements for rehabilitating the Tappan Zee Bridge.