Level Floors at the Right Cost
Author(s):
Ian Blair
Publication:
Concrete International
Volume:
28
Issue:
9
Appears on pages(s):
66-68
Keywords:
levelness; screeding; slab construction; slabs; tolerances
DOI:
Date:
9/1/2006
Abstract:
With the exception of replacing optical levels with laser levels, the placement and strike-off of concrete for elevated floor slabs has remained virtually unchanged for 3 decades. Wet screeding, with its inherent low level of control over elevation and levelness, continues to be the norm. The new laser-controlled device descibed in this article permits the construction of slabs using wet screeds while easily achieving floor levelness (FL) values between 20 and 35.