Title:
506-85: Guide to Shotcrete
Author(s):
Publication:
Technical Documents
Volume:
Issue:
Appears on pages(s):
41
Keywords:
concrete construction; concrete finishing (fresh concrete); equipment; mix proportioning; mortars (material); placing; quality control; shotcrete.
DOI:
Date:
1/1/1985
Abstract:
Note: A newer version of this document exists. This document was replaced by 506R-90.
This guide provides information on materials and properties of both dry-mix and wet-mix shotcrete. Most facets of the shotcrete process are covered including application procedures, equipment requirements, and responsibilities of the shotcrete crew. Preconstruction, prequalifying, and acceptance testing of workers, materials, and finished shotcrete are also considered.