Title: Philadelphia Parking Garage Erected Using beam Forming System

Author(s): William B. Fellmeth

Publication: Concrete International

Volume: 16

Issue: 11

Appears on pages(s): 19-20

Keywords: brackets; joists; post-tensioning; pressure grouting; structural forms; Construction

DOI:

Date: 11/1/1994

Abstract:
A 13-level, double-helix parking garage for 800 cars has been completed using a Symons Corporation steel garage beam forming system that was stripped, transported, and reset by a combination of forklift trucks and a crane. The post-tensioned beam and slab garage was built beginning in August of 1993 and continued until February of 1994. The article is a report of the events included in completing the garage. (ACI)




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer