Title:
Time as a Factor in Making Concrete-Centrifugal Pipe Manufacture
Author(s):
F.F. Longley
Publication:
Journal Proceedings
Volume:
23
Issue:
2
Appears on pages(s):
481-482
Keywords:
none
DOI:
10.14359/15430
Date:
2/1/1927
Abstract:
In the manufacture of centrifugal pipe, the manipulation of the concrete immediately after mixing, is done in a way that results in a very low water ratio at the time effective hydration of the cement and setting of the concrete commences.