Title:
Contractors Alternate Saves $2 Million on Louisville Building
Author(s):
Charles J. Pankow
Publication:
Journal Proceedings
Volume:
70
Issue:
5
Appears on pages(s):
341-345
Keywords:
cold weather construction : concrete construction;concrete panels; contr,actors; costs; formwork (construction); lightweight aggregate concretes; multistory buildings;precast concrete; prestressed concrete; pretensioning.
DOI:
10.14359/11216
Date:
5/1/1973
Abstract:
Describes how alternate reinforced concrete proposal for a 30 story building saved considerable money. The alternate construction is discussed and the importance of coordination between architect, engineer and builder is emphasized.