Title:
Placing with the Times
Author(s):
Seth Ulmer
Publication:
Concrete International
Volume:
47
Issue:
8
Appears on pages(s):
46-48
Keywords:
curb, gutter, machine, flatwork
DOI:
Date:
8/1/2025
Abstract:
Traditional placements often require curb and gutter work to be placed, finished, and cured to outline the pavement area before completion of the flatwork. Monolithic placements, or all-in-one placements, improve efficiency by completing the curb and gutter at the same time as the flatwork. Curbing machines with multiple drum options are the proper tools for such placements.