Title: Place the Crew on Overtime

Author(s): Awad S. Hanna and Michael Maples

Publication: Concrete International

Volume: 19

Issue: 9

Appears on pages(s): 71

Keywords: construction management; construction schedules; costs; productivity; worker training;

DOI:

Date: 9/1/1997

Abstract:
Contractors confronted with the need to compress or accelerate a construction schedule face the potential for extreme difficulties. Construction overtime can be a popular option to effectively compress a project schedule. For a short duration, the additional costs associated with placing crews on overtime may be less than the cost of training new workers.




  