Email Address is required Invalid Email Address
In todayโs market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have itโฆthey are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Founded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensus-based standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete.
Staff Directory
ACI World Headquarters 38800 Country Club Dr. Farmington Hills, MI 48331-3439 USA Phone: 1.248.848.3800 Fax: 1.248.848.3701
ACI Middle East Regional Office Second Floor, Office #207 The Offices 2 Building, One Central Dubai World Trade Center Complex Dubai, UAE Phone: +971.4.516.3208 & 3209
ACI Resource Center Southern California Midwest Mid Atlantic
Feedback via Email Phone: 1.248.848.3800
ACI Global Home Middle East Region Portal Western Europe Region Portal
Home > Tools > Frequently Asked Questions
Q. What is the cause of false set? A. False set is a form of premature stiffening of the paste or concrete, which occurs within 1 to 5 min after mixing. False set can be eliminated by continuous mixing or by reworking and may not be noticed on jobs supplied by truck mixers or with central-mixed concrete that is agitated during delivery to the site. The most common cause is the presence of gypsum that has partially dehydrated to form plaster of paris (CaSO4 ⋅ 1/2 H2O), which results if the temperature in the grinding mill is too high. Later, when water is added to the cement, the plaster of paris immediately starts to hydrate to gypsum and stiffen. Reworking breaks this stiffness and allows normal hydration. To keep the temperature below the dehydration point of gypsum, the clinker should be cooled before grinding. References: SP-1(02); ACI Physical Testing of Cement Training Video; ASTM C403; ASTM C191; ASTM C266; ASTM C953 Topics in Concrete: Concrete Fundamentals
Q. What is the cause of false set?
A. False set is a form of premature stiffening of the paste or concrete, which occurs within 1 to 5 min after mixing. False set can be eliminated by continuous mixing or by reworking and may not be noticed on jobs supplied by truck mixers or with central-mixed concrete that is agitated during delivery to the site. The most common cause is the presence of gypsum that has partially dehydrated to form plaster of paris (CaSO4 ⋅ 1/2 H2O), which results if the temperature in the grinding mill is too high. Later, when water is added to the cement, the plaster of paris immediately starts to hydrate to gypsum and stiffen. Reworking breaks this stiffness and allows normal hydration. To keep the temperature below the dehydration point of gypsum, the clinker should be cooled before grinding.
References: SP-1(02); ACI Physical Testing of Cement Training Video; ASTM C403; ASTM C191; ASTM C266; ASTM C953
Topics in Concrete: Concrete Fundamentals
Search other resources on the ACI website for answers to technical questions