COL-2(18): Volume 2 & Index ACI Collection of Concrete Codes, Specifications, and Practices

COL-2(18): Volume 2 & Index ACI Collection of Concrete Codes, Specifications, and Practices

Your Price: $275.50 USD

Member Price: $165.00 USD

Save $110.50 USD, Become a Member

Choose Product Language

Choose Product Format

Quantity:


Notes/Preview

Click Here to download the complete ACI Collection 2018 Index for FREE

Description

The ACI Collection of Concrete Codes, Specifications, and Practices volumes are issued annually and include the latest ACI standards and committee reports when published.

Part 1 — ACI 117-10(15) to ACI 224.2R-92(04)

Part 2 — ACI 224.3R-95(13) to ACI 313-16

Part 3 — ACI 314R-16 to ACI 341.2R-14

Part 4 — ACI 341.3R-07 to ACI 350-06

Part 5 — ACI 350.1-10 to ACI 370R-14

Part 6 — ACI 371R-16 to ACI 441R-96

Part 7 — ACI 445R-99(15) to ACI 544.5R-10

Part 8 — ACI 544.6R-15 to ITG-9R-16

 

Document Details

Publication Year: 2017

Pages: 0

Categories: ACI Collection

Formats: Printed Document

Table of Contents

224.3R-95 Reapproved 2013 Joints in Concrete Construction, Part 2

224.4R-13 Guide to Design Detailing to Mitigate Cracking, Part 2

225R-16 Guide to the Selection and Use of Hydraulic Cements, Part 2

228.1R-03 In-Place Methods to Estimate Concrete Strength, Part 2

228.2R-13 Report on Nondestructive Test Methods for Evaluation of Concrete in Structures, Part 2

229R-13 Report on Controlled Low-Strength Materials, Part 2

230.1R-09 Report on Soil Cement, Part 2

231R-10 Report on Early-Age Cracking: Causes, Measurement, and Mitigation, Part 2

232.1R-12 Report on the Use of Raw or Processed Natural Pozzolans in Concrete, Part 2

232.2R-03 Use of Fly Ash in Concrete, Part 2

232.3R-14 Report on High-Volume Fly Ash Concrete for Structural Applications, Part 2

233R-17 Guide to the Use of Slag Cement in Concrete and Mortar, Part 2

234R-06 Reapproved 2012 Guide for the Use of Silica Fume in Concrete, Part 2

237R-07 Self-Consolidating Concrete, Part 2

238.1R-08 Report on Measurements of Workability and Rheology of Fresh Concrete, Part 2

238.2T-14 Concrete Thixotropy, Part 2

241R-17 Report on the Application of Nanotechnology and Nanomaterials in Concrete, Part 2

301-16Specifications for Structural Concrete, Part 2

302.1R-15 Guide to Concrete Floor and Slab Construction, Part 2

302.2R-06 Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring Materials, Part 2

303R-12 Guide to Cast-in-Place Architectural Concrete Practice, Part 2

304R-00 Reapproved 2009 Guide for Measuring, Mixing, Transporting, and Placing Concrete, Part 2

304.2R-17 Guide to Placing Concrete by Pumping Methods, Part 2

304.3R-96 Reapproved 2004 Heavyweight Concrete: Measuring, Mixing, Transporting, and Placing, Part 2

304.4R-95 Reapproved 2008 Placing Concrete with Belt Conveyors, Part 2

304.6R-09 Guide for Use of Volumetric-Measuring and Continuous-Mixing Concrete Equipment, Part 2

305R-10 Guide to Hot Weather Concreting, Part 2

305.1-14 Specification for Hot Weather Concreting, Part 2

306R-16 Guide to Cold Weather Concreting, Part 2

306.1-90 Reapproved 2002 Standard Specification for Cold Weather Concreting, Part 2

307-08Code Requirements for Reinforced Concrete Chimneys (ACI 307-08) and Commentary, Part 2

308R-16 Guide to External Curing Concrete of Concrete, Part 2

(308-213)R-13 Report on Internally Cured Concrete Using Prewetted Absorptive Lightweight Aggregate, Part 2

308.1-11 Specification for Curing Concrete, Part 2

309R-05 Guide for Consolidation of Concrete, Part 2

309.1R-08 Report on Behavior of Fresh Concrete During Vibration, Part 2

309.2R-15 Guide to Identification and Control of Visible Effects of Consolidation on Formed Concrete Surfaces, Part 2

309.5R-00 Reapproved 2006 Compaction of Roller-Compacted Concrete, Part 2

310R-13 Guide to Decorative Concrete, Part 2

311.4R-05 Guide for Concrete Inspection, Part 2

311.5-04 Guide for Concrete Plant Inspection and Testing of Ready-Mixed Concrete, Part 2

311.6-09 Specification for Ready Mixed Concrete Testing Services, Part 2

311.7-14 Inspection Services Specification for Cast-in-Place Concrete Construction, Part 2

313-16Design Specification for Concrete Silos and Stacking Tubes for Storing Granular Materials (ACI 313-16) and Commentary, Part 2

ERRATA INFO

Any applicable errata are included with individual documents at the time of purchase. Errata are not included for collections or sets of documents such as the ACI Collection. For a listing of and access to all product errata, visit the Errata page.

Return/Exchange Policy

Printed / Hard Copy Products: The full and complete returned product will be accepted if returned within 60 days of receipt and in salable condition. A 20% service charge applies. Return shipping fees are the customer’s responsibility.

Electronic /Downloaded Products & Online Learning Courses: These items are not eligible for return.

Exchanges: Contact ACI’s Customer Services Department for options (+1.248.848.3800 – ACICustomerService@concrete.org).