Title:
The Coleman Du Pont Road, Delaware
Author(s):
Charles Upham
Publication:
Journal Proceedings
Volume:
12
Issue:
2
Appears on pages(s):
449-452
Keywords:
none
DOI:
10.14359/16009
Date:
2/1/1916
Abstract:
During 1915 work was commenced on the southerly 20-mile section of Coleman du Pont Road. As fast as the right of way is obtained, the road will be extended from the Maryland line through central Delaware toward the Pennsylvania boundary. Approximately 55 per cent of the present constrctionwas completed before cold weather, and it is estimated that, with the six mixers now ready for work, the remainder of this section can be completed in 1 1;/2 months.