ACI Global Home Middle East Region Portal Western Europe Region Portal
In today’s market, it is imperative to be knowledgeable and have an edge over the competition. ACI members have it…they are engaged, informed, and stay up to date by taking advantage of benefits that ACI membership provides them.
Read more about membership
Learn More
Become an ACI Member
Topics In Concrete
Home > Publications > International Concrete Abstracts Portal
The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.
Showing 1-5 of 239 Abstracts search results
Document:
CI4706Allred
Date:
June 1, 2025
Author(s):
Bryan Allred, Frank Malits, and Neel Khosa
Publication:
Concrete International
Volume:
47
Issue:
6
Abstract:
For all concrete structures, cost effectiveness is heavily influenced by the timing of formwork cycling. For post-tensioned structures, review and approval of elongation records is a critical step within each formwork cycle. This article explores the timeliness of reviews, purpose of elongations and tolerances, evaluation of stressing records, and reasonable expectations for all stakeholders.
CI4604Britt_spotlight
April 1, 2024
Jennifer Britt
46
4
Existing concrete slabs and structures require scanning and imaging before any build out, renovation, or excavation work begins. Ground-penetrating radar technology has established itself as the primary tool for fast, effective, and efficient determination of the presence of utilities and embedded structural members, such as post-tensioning tendons and reinforcing bars.
CI4601Klinger
January 1, 2024
James Klinger, Joseph F. Neuber Jr., Jeffrey Ondo, and Bruce A. Suprenant
1
Placing and finishing of concrete slabs with portland-limestone cement (Type IL cement) may create issues for some contractors, and bleeding rate is a major factor. The article discusses saw cutting, cold weather protection, post-tensioning, and form removal, as well as best practices and strategies to minimize risks during floor slab finishing and early-age, strength-critical construction with Type IL cement.
CI4510Weilacher
September 29, 2023
Weilacher, R.M.; Newsome, J.; and Harrison, G.H.
45
10
Riverworks at Eastern Wharf is a mixed-use development in Savannah, GA, USA. A massive fire at the construction site caused severe damage to this project. The article describes the investigation of the structure’s condition after the fire, damage evaluation, and repair of the concrete structure of the podium slab and post-tensioning cables.
CI4306Reigstad
June 1, 2021
Gordon H. Reigstad, Jason G. Reigstad, and Jared M. Reigstad
43
Volume change is a challenging aspect of reinforced concrete and post-tensioned construction. If no measures are taken to minimize restraint to shortening from columns, braced frames, moment frames, and shear walls, strains resulting from concrete shrinkage, creep, temperature, and elastic shortening associated with post-tensioning can result in high tensile stresses and significant cracking. In an elevated slab, the common solution is to use a pour strip. An innovative pour strip design based on the use of mechanical couplers is discussed.
Results Per Page 5 10 15 20 25 50 100
Edit Module Settings to define Page Content Reviewer