Incremental Launching of Concrete Structures

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: Incremental Launching of Concrete Structures

Author(s): ARVID GRANT

Publication: Journal Proceedings

Volume: 72

Issue: 8

Appears on pages(s): 395-402

Keywords:

DOI:

Date: 8/1/1975

Abstract:
Development and current details of the incremental launching method of concrete structures—known as Taktschiebeverfahren in Europe-are described. The method permits employment of a highly industrialized approach to construction of major concrete bridges and other heavy and long structures. The process requires a minimum of temporary erection and support equipment; however, it makes it imperative that a consistent high degree of quality control is applied to the entire work. The method has been found to be very economical. Bridge spans longer than 330 ft (100 m) can be fabricated, and girders up to 2000 ft (600 m) long can be built and launched in a continuous operation.