Implementing Best Practices to Improve Quality and Constructability of Hot Weather Concreting

International Concrete Abstracts Portal

The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

  


Title: Implementing Best Practices to Improve Quality and Constructability of Hot Weather Concreting

Author(s): Oscar R. Antommattei

Publication: Symposium Paper

Volume: 338

Issue:

Appears on pages(s): 53-56

Keywords: Weather, Curing, Drying, Evaporation, Wind, Crusting, Cracking, Finishing, Testing

DOI: 10.14359/51724727

Date: 3/1/2020

Abstract:
During hot weather concreting, contractors have several options for dealing with slump loss and rapid drying of concrete surfaces. Limiting slump loss requires cooperation between the concrete producer and contractor, especially with respect to reducing truck waiting time. Several options for minimizing surface drying are compared, based on effectiveness and cost. Finally, providing for adequate initial curing of concrete test cylinders can reduce the possibility of schedule delays and increased costs related to low strength-test results.

Related References:

1. “Slump Loss of Concrete,” NRMCA TIP 12, National Ready Mixed Concrete Association, Silver Spring, MD, 2014. 2 pp.

2. “Checklist for the Concrete Pre-Construction Conference,” NRMCA and ASCC, National Ready Mixed Concrete Association, Silver Spring, MD, and American Society of Concrete Contractors, St. Louis, MO, 2006. 18 pp.

3. Hover, Kenneth C., “After Two Hundred Years of Estimating Evaporation, It Is Still a Mystery,” ACI SP 338, American Concrete Institute, 2020. doi: 10.14359/51724723

4. Suprenant, Bruce A., and Malisch, Ward R., “Understanding Wind Break Principles,” Concrete International, July 2012, pp. 35-39.

5. Hover, Kenneth C., “The Gentle Art of Fogging,” Concrete Construction, June 2005 6. Luther, Mark, “Fog Spray Costs,” Concrete Construction, Oct. 1987, p. 870.

7. https://bosstek.com/products/dust-control-solutions/db-30/

8. https://bosstek.com/atomized-mist-maintains-humidity-for-curing-concrete/

9. “Concrete Floor Construction (ACI 302.1R-15), American Concrete Institute, 2015, p.18.

10. Loe, David et al, “Better Concrete Starting at the Finish,” Construction Specifier, January 2014, https://www.constructionspecifier.com/better-concrete-starting-at-the-finish-long-term-benefits-of-colloidalsilica-based-finishing/

11. Hooker, Ken, “Finishing School,” Concrete Construction/Concrete Surfaces, July-Aug. 2016, pp. CS55-CS61.

12. Obla, Karthik et al,”Who Is Watching Out for Cylinders?” Concrete International, Aug. 2018, pp. 28-35.

13. Building Code Requirements for Structural Concrete and Commentary (ACI 318-14), American Concrete Institute, Farmington Hills, MI, 2014

14. ASTM C31/C31M, Standard Practice for Making and Curing Concrete Test Specimens in the Field, ASTM International, West Conshohocken, PA, 2018.

15. Specifications for Structural Concrete (ACI 301-16), American Concrete Institute, Farmington Hills, MI, 2016.