Title:
Innovations and conceptual approach to the construction of the Constitucion de 1812 Bridge over the Cadiz Bay
Author(s):
Viartola Laborda, L. M.; Paunero Alonso, D.; Jiménez Aguadero, V. M.; Morejón López, J. M.
Publication:
ACHE
Volume:
67
Issue:
278
Appears on pages(s):
21 - 30
Keywords:
Construction procedure, Innovation, Temporary works, Heavy lifting, Free cantilever construction, Launched deck, Cable stayed bridge
DOI:
Date:
1/3/2016
Abstract:
The 1812 Constitution Bridge over Cadiz Bay can be considered, from a construction point of view, as a succession of four separate bridges. These include the cable-stayed bridge with dimensions that exceed any bridge built to date in our country. This large size together with the location of a significant part of the bridge over the sea, influence the choice of construction procedures and the special means and equipment necessary to carry them out. The article describes the general approach of the bridge construction, highlighting some of the special operations carried out and their control, as well as innovations both in processes and equipment.
ACI International Partner, ACHE Spain, International Partner Access
View Resource »