International Concrete Abstracts Portal

  


Title: Bow-string bridge on Cordoba-Malaga high speed railway. Dynamic and constructional conditioning factors

Author(s): Castillo Linares, A.; Villameriel Fernández, M.; Montero Poyatos, G.; García Ramírez, M.; Moreno Jiménez, J. D.; Martínez Castro, A.

Publication: ACHE

Volume: 61

Issue: 258

Appears on pages(s): 25 - 42

Keywords: bow-string, composite structure, high speed, dynamic analysis, semianalytical method.

DOI:

Date: 1/8/2010

Abstract:
The New High Speed Line belonging to the Platform Duplication Project of Andalucía Cross-sectional Railway Axis, crosses the existing High Speed Line Cordoba-Malaga close to the town of Santa Ana (Antequera), with significant skew. This, in addition to the rules marked by ADIF on minimum horizontal and vertical patterns to respect in good conditions for the inferior route, forces the bridge holding the new railway route to have a central span length superior to 85 m. Between the possible structural solutions, and after the accomplishment of a laborious dynamic study, a bow-string bridge is finally decided, holding a main span of 86,40 m long, and access spans of 32,40 and 27,0 m to both sides of the central one, so that its overall length is 205,20 m (27,0 + 32,40 + 86,40 + 32,40 + 27,0 m).


ACI International Partner, ACHE Spain, International Partner Access

View Resource »  



  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.