Title:
Cable stayed footbridge, to access the intake tower of the Francisco Abellán Dam
Author(s):
Llombart, J.A.; Revoltós Fort, J.
Publication:
ACHE
Volume:
47
Issue:
201
Appears on pages(s):
81 - 94
Keywords:
DOI:
Date:
1/5/1996
Abstract:
This paper describes a cable stayed footbridge, built to access the intake tower of the Francisco Abellán Dam. The footbridge is a symmetric structure with two spans of 45,00 m each, and a composite box girder. The construction was done by launching the wall steel structure from one hillside, in order to avoid expensive lifting means due to high cliff.
ACI International Partner, ACHE Spain, International Partner Access
View Resource »