International Concrete Abstracts Portal

  


Title: Three-Span Continuous Prestressed Concrete Bridge Constructed of Precast Units in Cantilever Construction

Author(s): Arne Lundgren and Frode Hansen

Publication: Symposium Paper

Volume: 23

Issue:

Appears on pages(s): 665-680

Keywords: box beams; bridge piers; bridges (structures); cantilever bridges; concrete construction; continuity (structural); deflection; girders; influence lines; moments; precast concrete; prestressed concrete; prestressing; shear; stresses; structural design

DOI: 10.14359/17260

Date: 1/1/1969

Abstract:
A curved three-span bridge across the Taf Fawr valley in Wales, 100 ft above river level, is 470 ft long, with a 216-ft center span.




  


ABOUT THE INTERNATIONAL CONCRETE ABSTRACTS PORTAL

  • The International Concrete Abstracts Portal is an ACI led collaboration with leading technical organizations from within the international concrete industry and offers the most comprehensive collection of published concrete abstracts.

Edit Module Settings to define Page Content Reviewer