Title:
Concrete Q&A: Designing Shoring/Reshoring Schedules for a Fast-Track Project
Author(s):
Pericles C. Stivaros
Publication:
Concrete International
Volume:
45
Issue:
6
Appears on pages(s):
79-80
Keywords:
slab, load, strength, form
DOI:
Date:
6/1/2023
Abstract:
We are in the process of designing shoring and reshoring schedules for the construction of a high-rise flat-plate type reinforced concrete building on a tight schedule. Does ACI have guidelines and/or recommendations for construction procedures that can help us meet the fast-track project requirements?