Title: 522R-06: Pervious Concrete
Author: ACI Committee 522
Year of Publication: 2006
Number of Pages: 25
This document is: Historical
Nonmember Price: $56.50
ACI Member Price: $33.00
Order Code: 52206
Abstract: Click here to view the first two pages of this publication - pdf file format
This report provides technical information on pervious concrete’s application,design methods, materials, properties, mixture proportioning, construction methods, testing, and inspection. The term “pervious concrete” typically describes a zero-slump, opengraded material consisting of portland cement, coarse aggregate, little or no fine aggregate, admixtures, and water. The combination of these ingredients will produce a hardened material with connected pores, ranging in size from 0.08 to 0.32 in. (2 to 8 mm), that allow water to pass through easily. The void content can range from 18 to 35%, with typical compressive strengths of 400 to 4000 psi (2.8 to 28 MPa). The drainage rate of pervious concrete pavement will vary with aggregate size and density of the mixture, but will generally fall into the range of 2 to 18 gal./min/ft2 (81 to 730 L/min/m2). Keywords: construction; design; drainage; permeability; pervious concrete pavement; stormwater; testing.
Contents: CONTENTS Chapter 1—Introduction, p. 522R-2 Chapter 2—Applications, p. 522R-2 2.1—General 2.2—Building applications: history 2.3—Pavement applications 2.4—Other applications Chapter 3—Materials, p. 522R-5 3.1—General 3.2—Aggregates 3.3—Cementitious materials 3.4—Water 3.5—Admixtures Chapter 4—Properties, p. 522R-5 4.1—General 4.2—Compressive strength 4.3—Flexural strength 4.4—Air void content/unit weight 4.5—Percolation rate 4.6—Durability 4.7—Acoustic absorption Chapter 5—Mixture proportioning, p. 522R-9 5.1—General 5.2—Proportioning criteria Chapter 6—Pervious pavement design, p. 522R-9 Chapter 7—Pervious pavement construction, p. 522R-9 7.1—Subgrade preparation and layout 7.2—Placing 7.3—Consolidation 7.4—Jointing 7.5—Curing and protection 7.6—Cold weather protection 7.7—Hot weather protection 7.8—Repairing pervious concrete pavements 7.9—Maintenance Chapter 8—Quality control inspection and testing, p. 522R-14 8.1—General 8.2—Preconstruction inspection and testing 8.3—Inspection and testing during construction 8.4—Postconstruction inspection and testing Chapter 9—Performance, p. 522R-15 9.1—General 9.2—Clogging 9.3—Structural distress 9.4—Resistance to freezing and thawing Chapter 10—Limitations, potential applications, and research needs, p. 522R-16 10.1—Pervious concrete in cold climates 10.2—Compressive strength 10.3—Porous grout 10.4—Stormwater management Chapter 11—References, p. 522R-18 11.1—Referenced standards and reports 11.2—Cited references Appendix A—Hydraulic design discussion, p. 522R-20 A.1—General A.2—Research to date A.3—Pervious pavement maintenance A.4—Drainage design A.5—Pervious area credit A.6—Design examples
|