|
Abstract: Click here to preview
This document covers general construction requirements for cast-in-place structural concrete and slabs-on-ground. The first five sections cover materials and proportioning of concrete; reinforcement and prestressing steel; production, placing, finishing, and curing of concrete; formwork performance criteria and construction; treatment of joints; embedded items, repair of surface defects; and finishing of formed and unformed surfaces. Provisions governing testing, evaluation, and acceptance of concrete as well as acceptance of the structures are included. The remaining sections are devoted to architectural concrete, lightweight concrete, mass concrete, posttensioned concrete, shrinkage-compensating concrete, industrial floor slabs, tilt-up construction, precast structural concrete, and precast architectural concrete. Keywords: architectural; cold weather; compressive strength; durability; concrete slab; consolidation; curing; finish; formwork; grouting; hot weather; industrial floors; inspection; joints; lightweight concrete; mass concrete; mixture proportions; placing; precast; post-tensioned; prestressing steel; repair; reshoring; shoring; shrinkage-compensating; slabs-on-ground; steel reinforcement; testing; tilt-up; tolerance; welded wire.
Contents: CONTENTS (mandatory portion follows) Section 1—General requirements, p. 5 1.1—Scope 1.1.1—Work specified 1.1.2—Work not specified 1.1.3—Units 1.2—Definitions 1.3—Referenced standards and cited publications 1.3.1—Referenced standards 1.3.2—Cited publications 1.3.3—Field references 1.4—Standards-producing organizations 1.5—Submittals 1.5.1—General 1.5.2—Contractor’s quality control 1.6—Quality assurance and quality control 1.6.1—General 1.6.2—Responsibilities of Contractor 1.6.3—Responsibilities of Owner’s testing agency 1.6.4—Tests on hardened concrete in place 1.6.5—Evaluation of concrete strength tests 1.6.6—Acceptance of concrete strength 1.6.7—Field acceptance of concrete 1.7—Acceptance of structure 1.7.1—General 1.7.2—Dimensional tolerances 1.7.3—Appearance 1.7.4—Strength of structure 1.7.5—Durability 1.8—Protection of in-place concrete 1.8.1—Loading and support of concrete 1.8.2—Protection from mechanical injury Section 2—Formwork and formwork accessories, p. 13 2.1—General 2.1.1—Description 2.1.2—Submittals 2.2—Products 2.2.1—Materials 2.2.2—Performance and design requirements 2.2.3—Fabrication and manufacture 2.3—Execution 2.3.1—Construction and erection of formwork 2.3.2—Removal of formwork 2.3.3—Reshoring and backshoring 2.3.4—Strength of concrete required for removal of formwork 2.3.5—Field quality control Section 3—Reinforcement and reinforcement supports, p. 16 3.1—General 3.1.1—Submittals 3.1.2—Material storage and handling 3.2—Products 3.2.1—Materials 3.2.2—Fabrication 3.3—Execution 3.3.1—Preparation 3.3.2—Placing Section 4—Concrete mixtures, p. 20 4.1—General 4.1.1—Description 4.1.2—Submittals 4.1.3—Quality control 4.1.4—Material storage and handling 4.2—Products 4.2.1—Materials 4.2.2—Performance and design requirements 4.2.3—Proportioning 4.3—Execution 4.3.1—Measuring, batching, and mixing 4.3.2—Delivery Section 5—Handling, placing, and constructing, p. 25 5.1—General 5.1.1—Description 5.1.2—Submittals 5.1.3—Delivery, storage, and handling 5.2—Products 5.2.1—Materials 5.2.2—Performance and design requirements 5.3—Execution 5.3.1—Preparation 5.3.2—Placement of concrete 5.3.3—Finishing formed surfaces 5.3.4—Finishing unformed surfaces 5.3.5—Sawed joints 5.3.6—Curing and protection 5.3.7—Repair of surface defects Section 6—Architectural concrete, p. 30 6.1—General 6.1.1—Description 6.1.2—Submittals 6.1.3—Quality control 6.1.4—Product delivery, storage, and handling 6.2—Products 6.2.1—Materials 6.2.2—Performance and design requirements 6.2.3—Proportioning concrete mixtures 6.3—Execution 6.3.1—Preparation 6.3.2—Placement of reinforcement 6.3.3—Batching, mixing, and transporting 6.3.4—Conveying and placement 6.3.5—Consolidation 6.3.6—Formwork 6.3.7—Formwork monitoring 6.3.8—Formwork removal 6.3.9—Repair of tie holes and surface defects 6.3.10—Finishing 6.3.11—Curing architectural concrete 6.3.12—Final cleanup 6.3.13—Final acceptance of architectural concrete Section 7—Lightweight concrete, p. 33 7.1—General 7.1.1—Description 7.1.2—Submittals 7.1.3—Aggregate storage and handling 7.2—Products 7.2.1—Aggregates 7.2.2—Performance and design requirements 7.2.3—Mixtures 7.2.4—Batching and mixing 7.3—Execution 7.3.1—Consolidation 7.3.2—Finishing 7.3.3—Field quality control Section 8—Mass concrete, p. 34 8.1—General 8.1.1—Description 8.1.2—General requirements 8.1.3—Submittals 8.2—Products 8.2.1—Materials 8.3—Execution 8.3.1—Curing and protection Section 9—Post-tensioned concrete, p. 35 9.1—General 9.1.1—Description 9.1.2—Submittals 9.1.3—Quality control 9.1.4—Product delivery, handling, and storage 9.2—Products 9.2.1—Materials 9.2.2—Proportioning grout mixtures 9.3—Execution 9.3.1—Installer certification 9.3.2—Inspection 9.3.3—Bonded tendon installation 9.3.4—Grouting 9.3.5—Unbonded tendon installation 9.3.6—Tendon tolerances 9.3.7—Concrete placement 9.3.8—Tensioning 9.3.9—Tendon finishing Section 10—Shrinkage-compensating concrete, p. 42 10.1—General 10.1.1—Description 10.1.2—General requirements 10.1.3—Submittals 10.2—Products 10.2.1—Materials 10.2.2—Performance and design requirements 10.2.3—Proportioning 10.2.4—Reinforcement 10.2.5—Isolation-joint filler materials 10.3—Execution 10.3.1—Reinforcement 10.3.2—Placing 10.3.3—Isolation joints 10.3.4—Curing Section 11—Industrial floor slabs, p. 43 11.1—General 11.1.1—Description 11.1.2—General requirements 11.1.3—Submittals 11.2—Products 11.2.1—Materials 11.2.2—Concrete mixture 11.2.3—Proportioning 11.2.4—Vapor retarder 11.2.5—Reinforcement 11.2.6—Load-transfer devices 11.2.7—Joint filler materials 11.2.8—Isolation-joint filler materials 11.2.9—Curing materials 11.2.10—Liquid surface densifier 11.2.11—Mineral or metallic shake surface hardeners 11.3—Execution 11.3.1—Preparation 11.3.2—Measuring, batching, and mixing 11.3.3—Delivery 11.3.4—Concrete placement 11.3.5—Finishing slab surface 11.3.6—Joints 11.3.7—Curing and protection 11.3.8—Liquid surface densifier 11.3.9—Joint filling Section 12—Tilt-up construction, p. 45 12.1—General 12.1.1—Description 12.1.2—Coordination 12.1.3—General requirements 12.1.4—Submittals 12.1.5—Tilt-up contractor qualifications 12.2—Products 12.2.1—Aggregates 12.2.2—Bearing shims 12.2.3—Bond breaker 12.2.4—Cast-in anchors and connections 12.2.5—Coloring agent 12.2.6—Curing compound 12.2.7—Face mixture 12.2.8—Grout 12.2.9—Sandwich insulation systems 12.3—Execution 12.3.1—Casting bed 12.3.2—Bond breaker 12.3.3—Reveals 12.3.4—Panel identification 12.3.5—Side forms 12.3.6—Placing concrete 12.3.7—Finishes 12.3.8—Smooth finishes 12.3.9—Smooth textured finishes 12.3.10—Treated textured finishes 12.3.11—Retarded exposed aggregate finishes 12.3.12—Bush-hammered exposed aggregate finish 12.3.13—Hand placed aggregate for exposed aggregate finish 12.3.14—Sandblasted finish 12.3.15—Veneer faced finish 12.3.16—Curing of panels 12.3.17—Handling and erection of panels 12.3.18—Tolerances 12.3.19—Testing for panel erection Section 13—Precast structural concrete, p. 46 13.1—General 13.1.1—Description 13.1.2—Submittals 13.1.3—Quality assurance 13.1.4—Product delivery, storage, and handling 13.2—Products 13.2.1—Performance requirements 13.2.2—Form materials and accessories 13.2.3—Prestressing steel 13.2.4—Concrete materials 13.2.5—Steel connection materials 13.2.6—Bearing pads and other accessories 13.2.7—Grout materials 13.2.8—Insulated panel components and accessories 13.2.9—Concrete mixtures 13.2.10—Form fabrication 13.2.11—Hardware 13.2.12—Fabrication 13.2.13—Fabrication tolerances 13.2.14—Finishes 13.2.15—Source quality control 13.2.16—Acceptance of precast elements 13.2.17—Defective Work 13.3—Execution 13.3.1—Preparation 13.3.2—Examination 13.3.3—Erection 13.3.4—Erection tolerances 13.3.5—Field quality assurance 13.3.6—Repairs 13.3.7—Cleaning Section 14—Precast architectural concrete, p. 52 14.1—General 14.1.1—Description 14.1.2—Submittals 14.1.3—Sample panels and mockup 14.2—Products 14.2.1—Window washing system 14.2.2—Stone to precast concrete anchorages 14.2.3—Form liners 14.2.4—Surface retarder 14.2.5—Thin and half-brick units and accessories 14.2.6—Glazed and unglazed ceramic tile units 14.2.7—Architectural terra cotta units 14.2.8—Setting mortar 14.2.9—Latex portland cement pointing grout 14.2.10—Setting systems for brick and ceramic tile 14.2.11—Stone facing 14.2.12—Form fabrication 14.2.13—Stone facing installation 14.2.14—Face and backup concrete mixtures 14.2.15—Precast architectural concrete unit finishes 14.3—Execution 14.3.1—Erection (nonmandatory portion follows) Notes to Specifier, p. 56 General notes Foreword to checklists Mandatory Requirements Checklist Optional Requirements Checklist Submittals Checklist (mandatory portion follows)
|