Upcoming Standards  
   

When a draft ACI Standard is processed through ACI's ANSI-approved standardization procedures, it is made available to public review for a 45-day discussion period. If there are any draft ACI Standards available for public discussion, links to those drafts are provided below.

You are invited to read these draft ACI Standards and provide comment. Please note that these drafts are not yet official ACI Standards.

Comments should be e-mailed to discussion@concrete.org or mailed to Jessie L. Bournay, Manager, Technical Documents, American Concrete Institute, 38800 Country Club Drive, Farmington Hills, MI 48331. Comments must be received by the end of the public discussion period.

All comments will be responded to by the originating committee. After the committee response is approved, comments and responses will be posted on this web page for 90 days.

Design of a Special Unbonded Post-Tensioned Precast Shear Wall Satisfying ACI ITG-5.1 Requirements (ACI ITG-5.2-09) Closure

Specification for Cast-in-Place Concrete Pipe (ACI 346-09) Closure


ACI Draft Standards in Progress or Recently Completed


Designation Document Title Public Discussion Open Date Public Discussion Close Date Adoption Date Closure Anounced in CI
117Specifications for Tolerances for Concrete Construction and Materials and Commentary4/1/20095/17/2009
308.1Specification for Curing Concrete8/1/20099/17/2009
311.XSpecification for Ready-Mixed Concrete Testing Services8/1/20089/17/2008
346-09Specification for Cast-in-Place Concrete Pipe3/1/20094/17/20095/4/20095/26/2009
346M-09Specification for Cast-in-Place Concrete Pipe3/1/20094/17/20095/4/20095/26/2009
423.XTest Method for Bleed Stability of Cementitious Post-Tensioning Tendon Grout2/1/20093/17/2009
522.1-08Specification for Pervious Concrete Pavement8/1/20079/17/20071/25/20083/1/2008
ITG-5.2-09Design of a Special Unbonded Post-Tensioned Precast Shear Wall Satisfying ACI ITG-5.1 Requirements3/1/20094/17/20095/4/20095/26/2009
ITG-7Specification for Tolerances for Precast Concrete11/1/200812/17/2008